Washington ADU Laws (2026): What You Can Build, By Right
Inside urban growth areas, Washington State ADU laws require cities to allow two ADUs per lot, a size cap of at least 1,000 sq ft, and no owner-occupancy rule. The rules come from HB 1337 (2023). Your county's compliance date decides whether they reach your lot yet. Last verified Oct 2026.
- ADU-friendlyStatewide ADU law
- 1,000 sq ftSize cities must allow (at least)
- NoOwner-occupancy required
- CappedExtra parking (none near transit)
On this page
- Can you build in Washington?
- Washington law at a glance
- Washington size and design limits
- Washington owner-occupancy and parking
- Washington approval and timelines
- What Washington leaves to your city
- Washington checklist
- HomeWiP tools for Washington
- Washington FAQ

Who the law covers
Can You Build an ADU in Washington?
Yes, if your lot is in an urban growth area and zoned for a single-family home. HB 1337 took effect July 23, 2023. It binds cities and counties that fully plan under the Growth Management Act. Partially planning counties aren't covered.
The rules reach your lot on your county's compliance date. From then on, they override conflicting local code:
- King, Kitsap, Pierce, Snohomish: in force since Dec 31, 2024.
- Clark, Thurston, Whatcom and 7 other counties: in force since Dec 31, 2025.
- Spokane, Yakima, Benton and 7 others: Dec 31, 2026.
- Remaining fully planning counties: June 30, 2027.
On rural lots, counties may opt in to one detached ADU under EHB 1345.
At a glance
Washington ADU Law at a Glance
Last verified October 1, 2026 against RCW 36.70A.680–.681.
State tier: ADU-friendly
Mercatus 2025: yes on all four core tests (no owner-occupancy rule, parking limits, by-right permits, both ADU types).
Governing law: HB 1337 (2023)
RCW 36.70A.680–.681, in force since July 23, 2023. Local timing changed in 2025; a rural option came in 2026.
Approval: administrative
Same permit path as the house, with no stricter design review.
Decision clock: 65 days
The default for a complete application without public notice. Cities may modify it.
Impact fees: capped at 50%
At most half of what the house would pay.
HOA override: conditional
Applies only to HOAs formed after July 23, 2023, in urban growth areas.
Size and design
What Are Washington's ADU Size and Design Limits?
Cities must allow two ADUs per lot, a size cap of at least 1,000 sq ft and 24 ft of height.
Detached or attached
City cap can't be lower than
- Floor area counts basements and attics, not garages
- Garage conversions allowed even if they break current setback or coverage rules; building codes still apply
Height
Height cities must allow
- Or the house's height limit, if that's lower
Per lot
ADUs allowed per lot
- 1 attached + 1 detached, 2 attached, or 2 detached
- Setbacks no stricter than for the house
- A detached ADU may sit on an alley lot line, unless the city routinely plows snow on that alley
- Cities can't block selling it as a condo unit
Owner-occupancy and parking
Do You Have to Live There or Add Parking for a Washington ADU?
You don't have to live there, and parking is capped or waived near major transit.

Owner-occupancy: No
Your city can't require you to live on the lot, unless a unit is a short-term rental.
Parking: capped
None within half a mile walking distance of a major transit stop. Elsewhere, at most 1 space per unit on lots under 6,000 sq ft, and 2 per unit on larger lots. The caps don't apply within 1 mile of SeaTac or where Commerce certifies a local safety study.
Approval
Is ADU Approval By-Right in Washington, or Does It Require a Public Hearing?
Usually by right: an ADU follows the house's permit path, and Washington ADU regulations allow no extra design review.
State law bars design review stricter than the house's, and Commerce tells cities to approve ADUs administratively. The statute doesn't ban hearings outright.
65 days after a complete application, longer with notice or a hearing. Cities may change these periods, and a missed deadline doesn't approve the permit. HB 2418 (2026) limits completeness checks to procedural items.
Impact fees are capped at 50% of the house's, and cities can't require street improvements. Utility connection fees are set locally.
See a plan on your Washington lot
Washington requires cities to allow two ADUs per urban lot once your county's compliance date passes, unless sewer or critical-area limits apply. Place a pre-designed plan in your backyard and see how it fits.
Local control
What Does Washington Law Still Leave Up to Your City?
Critical areas, sewer service and short-term rental limits are still local ADU rules.
Critical areas and overlays
State rules skip critical areas, buffers and impaired watersheds. Cities can bar wetland, habitat, flood and geohazard sites in zones of 1 unit/acre or less.
Exact setbacks
Your city sets them, but no stricter than the house's.
Sewer and septic
Cities may prohibit ADUs on lots without public sewer. Rural ADUs need septic proof.
Design standards
Clear and objective only, and no stricter than the house's.
Short-term rentals
Cities may restrict stays under 30 nights.
Permit timelines and fast tracks
Cities may change review periods and offer pre-approved plans or architect self-certification.
Checklist
How to Check Your City's ADU Rules in Washington
Confirm you're in an urban growth area
State rules apply only there, in fully planning counties.
Find your county's compliance date
It decides when state rules reach your lot.
Read your local ADU code
Note size caps, setbacks, parking and fees.
Check critical areas, overlays and your HOA
Pull your parcel's critical-areas map and read your CC&Rs.
Confirm sewer or septic
Your city can bar ADUs on lots without public sewer. On septic? Ask whether your city allows ADUs before you design.
Ask about fast tracks
Ask about pre-approved plans, architect self-certification and a pre-application meeting.
The State of Washington in the news
Edmonds launches pre-approved design program for ADUs
Jul 31, 2026 · The Daily Herald (Everett)
Edmonds now offers pre-reviewed detached-ADU designs, with plan prices capped at $1,000. Detached-ADU applications rose from 3 in 2024 to 40 in 2025.
Everett unveils pre-approved ADU designs, aims to cut permit timelines
Jun 23, 2026 · The Daily Herald (Everett)
Everett released three pre-approved designs of 820 to 1,000 sq ft, targeting permits in about three months. It approved 51 ADU permits in the first half of 2026.
Governor Ferguson signs bills improving housing
Mar 27, 2026 · Office of the Governor
The governor signed HB 1345 (rural ADUs) and HB 2418 (permitting). "ADUs can keep families and friends close, especially for families caring for a loved one."
HomeWiP tools for Washington
How Does HomeWiP Help With ADUs in Washington?
Our online tools work in any state. We don't handle Washington permits yet.
- View pre-designed plans in your backyard
Plans and online tools you can use in Washington
Place a pre-designed plan on your lot with the map and site visit tool, estimate costs with the calculator using your own local bids, and view it in AR.
- See an ADU in your backyard in AR
Where our expertise comes from
7+ years on ADUs, 700+ plans, 20+ California cities and counties, each project run from design to final inspection. Houses are built in similar ways and need similar utility connections, but Washington's codes and local plan check still apply.


FAQ
Washington ADU Laws: Frequently Asked Questions
It depends on your lot. State rules cover urban growth areas in fully planning counties from your county's compliance date. That date has passed for King, Kitsap, Pierce, Snohomish and the Clark/Thurston/Whatcom group. Spokane, Yakima, Benton and 7 others follow on Dec 31, 2026; the remaining counties by June 30, 2027.
No. Washington law bars cities from requiring you to live in the ADU or the house. The one exception: if a unit is a short-term rental, meaning stays under 30 nights, the city may require you to live in one of the units.
It depends on when and where it was formed. An HOA created after July 23, 2023, in an urban growth area can't restrict an ADU beyond what your city could (RCW 64.38.160 and 64.90.350). That rule doesn't cover older HOAs or associations formed to protect water from on-site wastewater. Read your CC&Rs before you design.
A city has 65 days to decide a complete application without public notice, 100 with notice and 170 with a hearing, and may change these periods. A late city refunds 10% or 20% of the permit fee unless it has adopted three or more process improvements under RCW 36.70B.160. Lateness doesn't approve the permit.
State law sets floors for ADU count, size and height, caps parking requirements and bans owner-occupancy rules. Your city can allow more. Your city still controls critical areas, sewer service, exact setbacks, objective design standards and short-term rentals. Check its code now; after your compliance date, state rules override conflicts.
Only if your county opts in. Since June 11, 2026, EHB 1345 lets counties allow one detached ADU on rural parcels. It's capped at 1,296 sq ft, must sit within 150 feet of the house and share its driveway, and needs metered water and septic proof.

Plan Your Washington ADU With a Pre-Designed Plan
Pre-designed plans
Everett and Edmonds now offer pre-approved designs to cut permit times. HomeWiP plans aren't pre-approved in any Washington city, so local permit review still applies.
Keep exploring beyond Washington
- See ADU laws in every state
- ADU house plans
- How pre-approved ADU plans work
- Choosing an attached or detached ADU
- Why ADU permits get rejected in plan check
- How much does an ADU cost?
- ADU cost calculator
Washington ADU law sources
- RCW 36.70A.681, limits on local ADU regulation
- Washington Department of Commerce, Accessory Dwelling Units
- Mercatus Center, A Taxonomy of State ADU Laws 2025
Last verified: October 1, 2026.