Nevada ADU Laws (2026): What's Settled, What's Still Local

Nevada's ADU law, AB 396 (the casita law), took effect July 1, 2026 as NRS 278.257 and covers single-family lots governed by Clark or Washoe County or by Las Vegas, Henderson, North Las Vegas, Reno or Sparks, outside Lake Tahoe. Size, owner-occupancy and approval stay with your city. Last verified Nov 11, 2026.

  • W.i.P.Work in progress: state law with gaps
  • Set by your cityMax detached ADU size
  • City may requireOwner-occupancy rule
  • 1 maxExtra parking, if street parking suffices

On this page

  1. Can You Build an ADU in Nevada?
  2. Nevada's ADU Law: What's Settled, What's Still Local
  3. What Are Nevada's ADU Size and Design Limits?
  4. Does Nevada Require Owner-Occupancy or Off-Street Parking for an ADU?
  5. Is ADU Approval By-Right in Nevada, or Does It Require a Public Hearing?
  6. What Does Nevada Law Still Leave Up to Your City?
  7. How to Check Your City's ADU Rules in Nevada
  8. The State of Nevada in the News
  9. How Does HomeWiP Help With ADUs in Nevada?
  10. Common Questions About ADUs in Nevada
Modern wood-clad backyard ADU exterior

The short answer

Can You Build an ADU in Nevada?

Yes, if Clark or Washoe County or one of the five named cities (Las Vegas, Henderson, North Las Vegas, Reno, Sparks) governs your lot, it's outside the Lake Tahoe region, and it's zoned single-family. Local rules such as lot minimums still apply.

AB 396 was approved June 6, 2025 as Chapter 365 and took effect July 1, 2026.

The law is NRS 278.257. Where it applies, your city can't ban a separate kitchen, require more than one extra parking space when existing and street parking are enough, set stricter side or rear setbacks than for the main house, or forbid long-term rental.

At a glance

Nevada's ADU Law: What's Settled, What's Still Local

NRS 278.257 settles a few rules for 2 counties and 5 cities and leaves size, fees and the rest local. Last verified Nov 11, 2026.

  • Work in progress: NRS 278.257

    2 counties and 5 cities, single-family zones only. The rest of Nevada and Tahoe are outside it.

  • Left to your city: approval

    By-right approval isn't required, so a city may hold a hearing or approve with a building permit alone.

  • Left to your city: owner-occupancy

    The statute is silent, so your city decides.

  • Settled: 1 extra space at most

    Max 1 extra space, only when existing and street parking meet the need.

  • Settled: attached, detached, internal

    Attached, detached and inside-the-house units all count as ADUs.

  • Settled: no street-improvement demands

    A city can't require public-street improvements, except to repair streets the work disturbs or for public health and safety.

Size and design

What Are Nevada's ADU Size and Design Limits?

In Clark and Washoe counties and the 5 covered cities, state law sets few design limits. Most numbers come from your local code.

Detached ADU

Set by your city
  • Reno: smaller than the main home and behind it

Attached ADU

Set by your city
  • A separate kitchen can't be banned, attached or detached

Height and setbacks

Set by your city
  • Side and rear setbacks: no stricter than for the main house
  • Residential building and safety codes still apply; commercial sprinkler rules don't

ADUs per lot

State law authorizes at most2
  • Your city may allow only 1

Modular Units

Ready-to-permit ADUs available in your State

Classic exterior. Pitch roof. Modern vibes. Pricing shows cost of module. Transportation, crane and site work excluded. Feasibility study required for a complete estimate for your address.

200 sq ft modular ADU exterior

200 sq ft. One-story Studio.

One bed. One bath. Starting from $68,000.

500 sq ft modular unit exterior

600 sq ft. One-story Cabin.

One bed. One bath. Optional loft. Starting from $174,000.

500 sq ft modular ADU with pitch roof

500 sq ft. One story.

One bed. One bath. Optional loft. Starting from $140,000.

Occupancy and parking

Does Nevada Require Owner-Occupancy or Off-Street Parking for an ADU?

In covered areas, Nevada ADU regulations settle parking but leave owner-occupancy to each city.

Interior conversion of an existing structure into a junior ADU
  • Owner-occupancy: Left to your city

    The statute doesn't say whether you must live on site. In covered areas, cities must allow long-term rental. HOA leasing rules can still apply.

  • Parking: 1 space at most

    If existing and street parking cover the ADU, a city can't require more than 1 extra space. Reno requires 1 on-site space.

Approval

Is ADU Approval By-Right in Nevada, or Does It Require a Public Hearing?

In Nevada, the approval path, timeline and fees are local.

Nevada doesn't require by-right approval, so your city chooses between planning review and a hearing, or may approve by building permit alone.

See an ADU on your own Nevada lot

Your city sets the size limit, so start with a compact plan. Browse our 500 sq ft ADU floor plans, then place one on your property with the site visit tool.

Local rules

What Does Nevada Law Still Leave Up to Your City?

Your city decides size, lot minimums and nightly rentals, and HOA rules still apply.

  • Not covered: most of Nevada

    Places not named in AB 396 use local zoning. The Lake Tahoe region follows local zoning and the Tahoe Regional Planning Agency's plan.

  • Left to your city: size and lot

    No state size cap or lot minimum. Reno requires a lot of at least 5,000 sq ft.

  • Nightly rentals: your city's call

    Covered cities and counties may ban nightly and other short stays. Reno dropped a proposed 28-day minimum stay.

  • Utilities and septic

    Water, sewer or septic and power capacity decide whether a detached ADU works. Ask each provider early.

  • Zoning overlays

    Historic districts, flood zones and other overlays add rules. Check your parcel before you pick a plan.

  • HOA rules

    NRS 278.257 says nothing about HOAs and doesn't override CC&Rs.

Checklist

How to Check Your City's ADU Rules in Nevada

  1. Confirm your lot is covered

    Clark or Washoe County or a covered city, outside Tahoe, zoned single-family? Then ask which owner-occupancy and size rules apply, in writing.

  2. Find your local ADU code

    Find the development code and its latest ADU amendment. Covered governments were due to adopt one by July 1, 2026.

  3. Search every local name

    Try accessory dwelling unit, casita, accessory living quarters (Clark County) and tiny house.

  4. Read your HOA's CC&Rs

    NRS 278.257 doesn't address HOAs, so your CC&Rs still apply. Get the current CC&Rs and design guidelines.

  5. Check utilities and overlays

    Confirm water, sewer and power capacity, and check for flood or historic overlays.

  6. Ask about approval and fees

    Building permit only, planning review or a special use permit (Clark County needs one on lots under 4,000 sq ft)? Ask before you design.

The State of Nevada in the News

Heat mitigation, teacher licensure, ADUs among 24 new Nevada laws taking effect July 1

June 30, 2026 · News 4 / Fox 11

A roundup of 24 new Nevada laws that took effect July 1, from heat mitigation to teacher licensure, with the ADU law among them. On ADUs, it notes that Reno's ordinance requires the unit to be smaller and lower than the main home.

Read at News 4 →

New Nevada law expands options for ADUs, 'casitas' as cities update codes by July 1

June 18, 2026 · Fox5 Las Vegas

Clark County's changes took effect March 5, 2026 and removed lot-size limits for accessory living quarters; lots under 4,000 sq ft still need a special use permit. Henderson made minor updates in fall 2025, and North Las Vegas says it already complies.

Read at Fox5 →

City of Reno votes to adopt ordinance regarding accessory dwelling units

October 9, 2025 · 2News

Reno allowed ADUs anywhere in the city that meet its standards: a 5,000 sq ft minimum lot, 1 on-site space, and a unit smaller than the main structure and behind it. A proposed 28-day minimum stay was dropped.

Read at 2News →

How we help

How Does HomeWiP Help With ADUs in Nevada?

We don't handle permits in Nevada. We bring 7+ years focused on ADUs, 700+ plans, and projects in 20+ California cities and counties run end to end, from design through permits and construction to final inspection. Permit rules change at the state line, but houses are built the same way and need similar utility connections.

  • Start with a pre-designed plan

    Pick a plan and place it on your Nevada lot with the site visit tool. Then check the fit with our map, ADU calculator and AR viewer.

    View pre-designed plans in your backyard
  • Talk to your city, then reach out

    Ask your planning department what your lot allows. Then contact us about plans and design.

    Contact us
ADU Planner app — selecting a pre-designed ADU plan
1000 sq ft ADU fire-resistant, rear side with deck

FAQ

Common Questions About ADUs in Nevada

Both. NRS 278.257 binds only Clark and Washoe counties and the cities of Las Vegas, Henderson, North Las Vegas, Reno and Sparks, and only on single-family lots. Other Nevada cities and counties follow local zoning, and the Lake Tahoe region follows local zoning and the Tahoe Regional Planning Agency's plan. Even in covered areas, your city or county sets size, owner-occupancy rules and the approval path.

1000 sq ft ADU fire-resistant, deck entry

Plan Your Nevada ADU With a Pre-Designed Plan

Next step

Choose a plan that fits your lot, check it in the site visit tool, then ask your planning counter what it needs.